During all the excitement of Data Suite 3 going live last week, fit out was progressing in the other two suites that form part of the Stage 1 refurb at C1 in Canberra. Above you're looking down the cold aisle of the first pod of racks in Data Suite 1, which we just finished assembling.

And below you can see the second pod halfway through being assembled. This one will get finished today and then we'll install the blue overhead containment on both pods. The blue and red rack doors will start to go in on Friday.

In addition to all this work in Data Suite 1, we're busy laying the flooring in Data Suite 2. We'll have some more pics of our Canberra data centre to show you soon.

 