What’s Next for Neo Clouds?

May 6, 2025

Share:

AI Infrastructure Has Evolved. Are You Ready for What’s Next?

Neo Clouds aren’t a passing trend. They represent a structural shift in how the world powers artificial intelligence.

Born out of necessity, these GPU-first platforms emerged to solve a growing challenge in enterprise computing: traditional cloud environments were never designed to meet the performance, scale, and efficiency requirements of modern AI workloads. These demands call for significantly higher power density, accelerated networking, low-latency interconnects, and advanced cooling — delivered with less architectural complexity and greater operational control.

For CIOs, CTOs, and technical decision-makers, this transformation is already reshaping strategic infrastructure priorities. It's influencing capital allocation, workload placement, data centre design, and the evaluation of technology partners capable of supporting production-grade AI at scale.

What’s Inside This Article

As AI infrastructure evolves, so do the strategic and operational demands placed on cloud platforms, data centre operators, and infrastructure leaders. Whether you're building a GPU-accelerated cloud, scaling inference to the edge, or planning the next phase of your AI environment, the requirements are shifting fast.

In this article, we explore the key trends shaping the next generation of AI infrastructure — and what they mean for your long-term strategy.

You can skip ahead to any section below:

  1. Neo Clouds Have Momentum. Now Comes the Acceleration.

  2. Rack Power Is Scaling to Super High-Density Levels

  3. Sustainability Pressure Will Shape the Next Build Cycle

  4. Interconnectivity Will Define AI Performance

  5. Proximity to the Edge Will Matter More

  6. The Neo Cloud Model Will Keep Evolving

  7. Key Takeaways

  8. NEXTDC: Built for What’s Next

Specialist GPU cloud providers are now entering their next phase of growth, bringing with them a new wave of infrastructure requirements that will reshape how and where AI workloads are deployed.

So here’s the question:
Will your infrastructure be a competitive advantage or a bottleneck in the age of Neo Clouds?

Whether you're a CIO evaluating your next data centre investment or a founder launching a GPU-powered platform, this is your roadmap to what’s coming next in Australia and beyond.

 


1. Neo Clouds Have Momentum. Now Comes the Acceleration.

A new category of cloud provider has emerged, purpose-built for AI. Known as Neo Clouds, companies like CoreWeave, Crusoe, Lambda, and SharonAI are leading the charge. What they’ve demonstrated is clear: the world wants faster, easier, and more cost-effective access to high-performance GPUs than what traditional, general-purpose clouds can offer.

Their rise has triggered a chain reaction across the infrastructure landscape:

  • Hyperscalers are partnering with or investing in Neo Cloud platforms

  • AI zones are forming near energy corridors and cable landing stations

  • Hybrid environments are being built, combining GPU clouds with edge infrastructure

What began as a niche has grown into a full ecosystem, and expectations around performance, availability, and deployment speed are increasing rapidly.

 

2. Rack Power Is Scaling to Super High-Density Levels

AI workloads are accelerating rapidly. Models are growing, training cycles are intensifying, and real-time inference is becoming the norm.

To keep up, Neo Clouds require infrastructure capable of supporting high-density power racks, with advanced cooling to ensure consistent performance and energy efficiency.

NEXTDC is already equipped to meet these demands, offering:

  • Infrastructure optimised for high-density, AI-driven workloads

  • Liquid cooling solutions designed for next-generation hardware

  • Rapid-deploy Rack Ready solutions, enabling immediate scalability

  • Designs underway to support up to 600kW per rack, preparing for future AI factories

AI doesn’t wait. Neither should your infrastructure. NEXTDC is building the foundation for what comes next — powering the ambitions of organisations across every sector.

For CIOs and CTOs: Ask yourself, is your infrastructure partner engineered for AI factories or built for yesterday’s workloads?

 

3. Sustainability Pressure Will Shape the Next Build Cycle

The next generation of Neo Clouds won't just be measured by performance; they'll be judged by efficiency.

The next generation of Neo Clouds won’t be measured by performance alone — they’ll be judged by efficiency.

Boards, regulators, and customers are asking the same questions:

  • Where is the energy coming from?

  • How efficient is your data centre?

  • What is the carbon impact per GPU-hour?

These expectations are reshaping infrastructure priorities and pushing the industry toward:

  • 100% renewable-powered facilities

  • Liquid cooling systems that reduce energy consumption and improve thermal efficiency

  • Detailed, auditable sustainability reporting aligned with ESG frameworks

NEXTDC is committed to reducing emissions and improving energy efficiency across our entire data centre portfolio. We’re designing for next-generation cooling, transparent ESG metrics, and long-term pathways that support the global shift toward Net Zero.

For organisational leaders: Building for AI also means building responsibly for your stakeholders, your sustainability goals, and the planet.

 

4. Interconnectivity Will Define AI Performance

AI doesn’t operate in isolation, it thrives in interconnected ecosystems.

As models grow more complex and real-time responsiveness becomes critical, the infrastructure powering them must do more than compute. It must connect quickly, securely, and globally.

Neo Clouds are increasingly deploying in data centres that offer direct access to:

  • Hyperscale cloud providers

  • Telcos and internet service providers

  • Subsea cable landing stations, for global replication and geographic redundancy

  • Financial institutions, SaaS platforms, and government networks

Why? Because AI at scale depends on:

  • Ultra-low latency, to and from data sources and application endpoints

  • High-throughput I/O, across hybrid and distributed architectures

  • Secure data flows, with minimal exposure to external risk

NEXTDC hosts one of Australia’s most richly interconnected digital ecosystems. Within a single, secure environment, we bring together cloud providers, network carriers, enterprise platforms, financial services, and government infrastructure.

This enables:

Faster data ingest and real-time model inference

Resilient, low-latency cross-cloud and multi-network connectivity

Greater control over data, supporting sovereignty, security, and compliance

For organisational leaders: Think of a Neo Cloud like a global airport hub. The more connected it is, the more valuable and efficient it becomes.

 

5. Proximity to the Edge Will Matter More

As AI shifts from training in the cloud to real-world deployment, where you serve your models from becomes just as critical as how you train them.

Neo Cloud providers and AI-driven organisations are moving infrastructure closer to end users, government precincts, and industry-specific zones to reduce latency, ensure compliance, and support real-time AI workloads.

To stay competitive, infrastructure must be built near:

  • Urban and regional hubs, to support latency-sensitive AI inference

  • Government zones, to meet data sovereignty and compliance obligations

  • Subsea cable landing stations and fibre exchanges, to enable fast, secure synchronisation of AI models across regions

NEXTDC’s nationwide footprint, covering every Australian capital city and key regional markets including Sydney, Melbourne, Brisbane, Sunshine Coast, Perth, Adelaide, and Darwin, provides GPU cloud providers with a sovereign and scalable foundation.

 For regulated industries: You can have both sovereignty and scale with no compromise.

 

6. The Neo Cloud Model Will Keep Evolving

The rise of Neo Clouds is just the beginning.

New models will continue to emerge, tailored to meet specific industry and workload demands. Expect to see:

  • Industry-specific GPU clouds, designed for sectors like media, legal tech, and life sciences

  • Cost-optimised GPU-as-a-Service platforms, offering flexible, transparent billing

  • Full-stack Neo Clouds, bundling infrastructure, orchestration, and AI tooling into a seamless experience

At the same time, hyperscalers may respond by:

  • Launching AI-only zones within existing cloud regions

  • Acquiring or partnering with specialist Neo Cloud providers

However, scale often brings complexity, and with it, a degree of inflexibility. The real competitive advantage lies with Neo Clouds that can:

Move fast

Build efficiently

Scale intelligently

Partner strategically, with infrastructure providers like NEXTDC that are purpose-built for AI

As GPU technology moves forward, new chips from companies like NVIDIA are pushing power demands toward 1000kW per rack, making fast deployment, smart cooling, and high-density support more important than ever.

Neo Clouds that evolve alongside these hardware shifts will define the future of AI infrastructure.

Key Takeaways

What’s Next What It Means for You
Super high-density power Support up to 600kW per rack today — with NVIDIA projecting racks could require up to 1000kW to support its Rubin Ultra GPUs by 2030.
Liquid cooling as standard Ensure your data centre partner can cool efficiently at scale, especially for high-density and GPU environments.
Sustainability expectations Look for providers that offer renewable power options, transparent emissions reporting, and a clear commitment to ESG accountability
Ecosystem interconnectivity Select facilities with cloud on-ramps, telco presence, and cable landing station access to support global AI workloads.
Edge proximity for AI inference Deploy close to your users and where data regulations require it, not just near your head office or cloud region

NEXTDC Built for What’s Next

NEXTDC isn’t waiting for the AI future — we’re building it.

Whether your organisation is launching a Neo Cloud, scaling GPU-as-a-Service, or embedding AI into enterprise infrastructure, we deliver the power, scale, and precision you need.

Our infrastructure is engineered to support the next generation of AI:

Super high-density power and cooling, with designs underway for direct-to-chip liquid cooling supporting up to 600kW per rack

DGX-certified AI infrastructure, purpose-built for NVIDIA-powered workloads

Tier 1 compliant, with Australia recognised as a Tier 1 export destination under U.S. AI chip regulations, enabling faster access to cutting-edge GPUs

Sovereign-grade, Tier IV-certified data centres, designed for maximum resilience, security, and compliance

Dense national digital ecosystem, connecting cloud providers, carriers, enterprises, and government — one of the largest in Australia

Strategic national footprint, with facilities in every major population centre and direct access to subsea landing stations and key fibre routes


Ready to Launch Smarter?

AI infrastructure isn’t just a cost centre — it’s a competitive advantage.

Whether you're building a Neo Cloud, expanding GPU-as-a-Service, or deploying AI across enterprise workloads, now is the time to move.

 

  Connect with NEXTDC’s team of AI infrastructure specialists and discover how we can design a deployment that’s scalable, sovereign, and ready for what’s next across Australia and Asia.


Related Reading

Neoclouds vs Hyperscalers: The Rise of AI-First Infrastructure (and What It Means for You)
Understand the shift toward AI-specialised cloud and how Neo Cloud providers are redefining the future.

 Power, Cooling & AI Readiness: How NVIDIA’s GTC 2025 Is Forcing a Rethink of Your Data Centre Strategy
Explore why legacy infrastructure won't cut it for the next generation of AI workloads.

 

Similar posts